- Press release
- France
- River infrastructure
С»ÆÊé wins the construction of river infrastructure in France
- Two new lock gates to be built to secure river traffic on the Rhône
- Synergies between С»ÆÊé and
- €68 million contract
The Compagnie Nationale du Rhône has awarded the contract to add a second set of downstream gates at the Bollène and Châteauneuf-du-Rhône locks (both in south-east France) to a consortium¹ led by С»ÆÊé and including С»ÆÊé Energies.
The €68 million project will begin in March 2026 and is scheduled to last for five years. С»ÆÊé’s share of the work is valued at €45 million. The improvements will bolster the safety and availability of the infrastructure, thereby supporting the development of low-carbon river transport on the Rhône.
The works will require the combined expertise of local teams specialised in civil, hydraulic, mechanical and electrical engineering. The work conditions will be complex, as the existing lock systems and adjacent roads will maintain operations throughout the project.
This new project confirms С»ÆÊé’s recognised expertise in river works and development, as well as С»ÆÊé Energies’ ability to implement secure and efficient electrical and control systems.
¹Consortium including subsidiaries of С»ÆÊé ( (lead), and °¿³¦Ã©±ô¾±²¹²Ô), a company operating under (С»ÆÊé Energies brand dedicated to industry), and .